首页 > > 详细

代做COMP30023、C++编程设计辅导

COMP30023: Introduction to projects
COMP30023 Head Tutors
March 24, 2023
1 Introduction
In this document, we will introduce how COMP30023 projects are structured, and outline how
you can make the most from the infrastructure which we provide.
Firstly, some attributes and expectations:
As per the handbook, there will be 2 projects weighted 15% each
Projects are to be completed individually
Submissions must be in written in C
Submissions must compile and run on COMP30023-provided VMs, and should produce
deterministic output
Submissions will be checked for plagiarism
2 Submission
The submission process may be slightly different to what you were used to. We expect:
Code to be submitted to your assigned Gitlab repository named comp30023-2023-project-
x in the subgroup with your username of the group comp30023-2023-projects on git-
lab.eng.unimelb.edu.au.
AND The full-40 digit SHA1 hash of your chosen commit to the relevant Project Assign-
ment on the LMS.
Failure to complete both successfully will result in mark deductions.
Upon submitting the hash, you should receive an automated comment indicating whether
your submission is valid/reachable on Gitlab. An example success message is: Taking commit
2e24d35658d1b552952d226f5362fa5863d09a3c from 2021-05-19T10:21:49Z, day 0.
Note that it acknowledges the hash which you submitted and the time of submission (given to
us by Canvas). From this, we calculate the day number: day 0 means that the submission is
on-time, day 1 means that it’s 1 day after the deadline, and so on.
We do not perform calculations on fractional days, and thus, it is up to you to consider whether
it’s worthwhile to make further submissions (if submitting late).
If you have an extension, please note that we will subtract your extension from this day number
when calculating your project mark.
1
3 Compilation
Unlike COMP20003 and COMP20007, we do not impose the usage of skeleton files or a particular
project structure (in terms of files/directories). You’re welcome to use either gcc or clang, and
anything in the C standard library (libc), and POSIX, provided it works on the VM, but
excluding calls to other libraries/services.
To ensure that your projects can be successfully tested, please make sure that there is a Makefile
at the root of your repository, which compiles the executable(s) defined in the specification to
the root of the repository also.
You’re welcome to write test cases and scripts (possibly in other languages) and use other build
systems during implementation. Feel free to keep these files for the final submission.
You can, but do not have to include copies of input files in your repository, as they will be
provided by the CI/marking environment.
Do not hard code file paths for test cases or files, or make assumptions about where your
executable will be launched from.
4 Testing
A breakdown of visible and hidden marks will be provided in project specifications.
We will endeavour to set up Gitlab Pipelines before the release of each project. The CI (Contin-
uous Integration) will allow you to test your code against visible cases and receive some limited
feedback before the submission deadline.
You can access the results of automated tests by following these steps:
1. Ensure that .gitlab-ci.yml is at the root of your repository.
After placing .gitlab-ci.yml at the root of your repository, every pushed commit should
trigger automated tests against your code.
2. After pushing a commit, you should see either a green tick mark, a blue pending progress
2
indicator, or a red cross to the right of the commit information.
Click this icon.
3. On the next screen, click the icon again, and access the test pipeline stage.
4. This will bring you to the very bottom of the test transcript for the latest commit.
Note that the marks shown in the results table of the transcript is indicative of marks you
will receive for visible test cases (and tasks). Please compare it with the number of possible
marks indicated in the specification.
The CI will fail (with a red cross) when any visible test case fails, and you may receive an email
about a failing pipeline from Gitlab.
We do not care about whether you use the CI when implementing your projects. However,
3
CI usage may be taken into account when considering extensions, plagiarism, and submission-
related issues.
Unless an error or alternative solution has been identified, in which case marks will be retroac-
tively awarded by re-testing all submissions, marks for automated components are final. There
will be no partial marks given for uncompilable or incorrect programs, nor ‘implementation
effort’.
Please note that when your submission fails in CI, it will likely fail the same way in the marking
environment. Debug your program on your VM in this case. Make sure that you’re happy
with what the CI reports.
5 Reading the Transcript
Here is an example transcript.
As it’s pretty straightforward, you may want to skip this section.
5.1 Header
The header should show that the test was executed on a COMP30023 runner, and the version
of the test script.
Running with gitlab-runner 15.9.1 (d540b510)
on admin-registry 2K4zH4xy, system ID: s_18ccc91b5924
...
$ /test.sh
COMP30023 2023 Project 1 Before Deadline Tests
v1, last modified 23/03/23
5.2 Commit Log
Next is the commit log. The top commit is the one that’s being tested.
Commit log:
8ec56c2f8ced6bbcabb6a946a24ef50d3f9d9278: Remove strip.
9544fc6320a3c26672147d31f8112c8e1315b90c: feat: -e optional parameter
5.3 Compilation
The compilation process will then be shown. If you’re missing marks for build quality, please
look to this section.
Common issues:
make clean is not implemented, or fails with non-zero status code
There are dirty files committed to the repository, or make clean is non-functional
Running make does not produce the required executable
Code files were marked with executable bit, use chmod -x to remove
4
make -B && make clean (output suppressed)
make clean
rm -f allocate process
make
gcc -c allocate.c -Wall -O2
gcc -c util.c -Wall -O2
gcc -o allocate allocate.o util.o -O2
OK -- ./allocate found. Copying to clean working directory.
5.4 Test case execution
Task 1 simple (0.5): Passed
Task 2 two processes (0.5): Passed
Each test will:
Come under a task in the marking criteria
Have a unique name (this will be reflect the names of sample test cases, if given)
Have a weight
Pass or fail
(Possibly) have diffs or error messages
5.5 Results table
Finally, there is the results table.
=============== START RESULTS TABLE ====================
Task 1: Shortest Job First 1.0
Task 2: Round Robin 1.5
Task 3: Best Fit Memory Allocation 1.5
Task 4: Controlling Real processes 1.5
Task 5: Performance statistics computation 1.0
Task 6: Build quality 1
Task 7: Quality of software practices #CODE_QUALITY#
Project 1 (Total): #TOTAL_MARKS#
================ END RESULTS TABLE =====================
Rows with ## are manually marked or excluded from CI.
This may include reports, challenge tasks, code quality etc.
Additionally, note that hidden cases are not included in the CI. Marks indicated are for visible
cases only.
6 Conclusion
This concludes our brief introductory guide to COMP30023 projects.
Please let us know if you find any issues with our infrastructure and feel free to ask for clarifi-
cation on any confusing aspects.

联系我们
  • QQ:99515681
  • 邮箱:99515681@qq.com
  • 工作时间:8:00-21:00
  • 微信:codinghelp
热点标签

联系我们 - QQ: 99515681 微信:codinghelp
程序辅导网!